A large part of the support infrastructure of the 114th Battle Wing is ready for use, while for what its completion is planned for 2022, due to the foreseen tender procedures, intermediate solutions have been determined and so the Rafale aircraft, which have already arrived, are operating immediately. and seamless. This was stressed by the Minister of National Defense Nikos Panagiotopoulos, answering a question submitted by MP Kyriakos Velopoulos on “Rafale support infrastructure”.
Regarding the equipment of the aircraft, such as spare parts, devices, ground means, consumables, and other materials, N. Panagiotopoulos pointed out that “it is received according to the schedule provided by the contract. At the present time, it has been received and transferred to 114 Wing “Most of the equipment of the first two of the four consignments in total, including the necessary equipment for the first stages of maintenance of the aircraft, is being fought.”
Regarding the trainings of the Air Force personnel in this type of aircraft, the Minister clarified that “they are implemented in accordance with the contractual provisions. of Dassault Aviation and the French Air Force, while further training is underway or planned in 2022 both in France and in the 114th Battle Wing “. “At the same time,” he added, “the staff whose training has been completed is fully prepared to take on the support of these aircraft.”
Moreover, answering a question submitted by Kyriakos Velopoulos on “Apart from the contracts, the participation of the domestic industry for” Rafale “”, N. Panagiotopoulos underlined: “The General Directorate of Defense Equipment and Investments (GDAEE) of the Ministry of National Defense is located already in contact with the construction companies of the aircraft, electronic systems, engine and weapons of the aircraft in order to be informed about the areas of cooperation with the Hellenic Defense Industry (EABI) in the context of ensuring the security of supply of the program but also to to consider an expected EABI participation plan in the program, and in particular the possibility of integrating EABI into the wider circle of subcontractors of their systems, disclosing specific elements of their design “.
In particular, he pointed out that “during the period of negotiations for the additional supply of the 6 Rafale fighter jets and their weapons and in response to the above, these companies made known in writing specific proposals in the context of ensuring security of supply and participation of EABI in the program and committed to their implementation “.
He clarified that “details can not be disclosed through this procedure, as they constitute classified information”.
He also stressed that “the draft contracts contain the proposal of an article that provides for the agreement of the parties for specific projects and actions, which will be beneficial for the implementation of the contracts and will concern the protection of the essential interests of the Greek National Defense and the security of supply “.
Source: ΑΠΕ-ΜΠΕ
Source: Capital

Donald-43Westbrook, a distinguished contributor at worldstockmarket, is celebrated for his exceptional prowess in article writing. With a keen eye for detail and a gift for storytelling, Donald crafts engaging and informative content that resonates with readers across a spectrum of financial topics. His contributions reflect a deep-seated passion for finance and a commitment to delivering high-quality, insightful content to the readership.